- February 21, 2019
- Posted by: Westhoek Construction
- Category: News
No Comments
![](https://westhoek.on.ca/wp-content/uploads/2019/02/20171207_154411-1110x550.jpg)
![](https://westhoek.on.ca/wp-content/uploads/2019/02/20171207_154411.jpg)
A couple of photos of the sanctuary before the renovations were started. We are renovating the sanctuary to rotate it 180 degrees. The renovations involve a complete strip of the existing, levelling the floor, new stage / pulpit area with accessible ramp and sound booth. The lower level classrooms are also completely renovated. Demolition of the sanctuary is completed and the floor reconstruction is underway.