- May 18, 2018
- Posted by: Westhoek Construction
- Category: News
No Comments
![](https://westhoek.on.ca/wp-content/uploads/2018/05/20180518_103942-2-e1526659598744-1110x550.jpg)
![](https://westhoek.on.ca/wp-content/uploads/2018/05/20180518_103942-2-e1526659598744.jpg)
The additions are all framed, shingled with windows and doors installed. Mechanical and electrical trades are starting while exterior finishes and deck construction is starting.