- August 16, 2018
- Posted by: Westhoek Construction
- Category: News
No Comments
![](https://westhoek.on.ca/wp-content/uploads/2018/08/Resized_20180813_094654_7059-1110x550.jpeg)
![](https://westhoek.on.ca/wp-content/uploads/2018/08/Resized_20180813_094654_7059.jpeg)
The phase 2 addition at St. Francis is progressing well. The building has been insulated and exterior veneer is being installed. Interior structural steel is starting and roof trusses are in place.